Scarabeo 5

Skrevet av ORS, 15.01.2014. Sist oppdatert 29.08.2014.

Well Clean Up, Gas Bleed Off and Fluid transfer

During well clean up fluid from a well was depressurised in a 2 stage separator where the fluid was diverted to two ORS 30m3 tanks, where after ORS pumped the fluid  and offloaded to storage boat.
 

All ORS Equipment was operated by our own technical personnel.